How do you calculate the size and length of a cable carrier?

Short answerCalculate chain length with Lk = S/2 + π × R + allowance, where S is the travel, R the bend radius and the allowance covers the connection points (one to two links at each end). First derive inner height and width from the fill plus 10 to 20% clearance, then the radius from the most sensitive cable. Always round up to whole links.

7 min readUpdated

S / 2π × Rvastpuntmeenemer
Figure: Chain length: half the travel, the half circle around the radius and the allowance for connection points.

Step 1: which dimensions come from the fill?

The thickest cable sets the inner height; the sum of the thickest layer sets the inner width. Add 10% clearance for calm applications and 20% at high speed, heat or outdoors. Include separator widths and reserve 15 to 20% for future additions.

Step 2: how do you determine the bend radius?

Take the strictest requirement of all cables: 7.5 × diameter for fixed installation, 10 × for moving applications and 15 × for fibre optics and some bus cables. Then pick the next radius in the series range. When in doubt go one step larger: it costs length but measurably extends cable life.

Step 3: how do you calculate the chain length?

Use Lk = S/2 + π × R + allowance. The π × R term is the half circle of the bend; the allowance covers the end connectors plus a small reserve so the bend does not hit the fixed point. For gliding arrangements add length for the driver height.

Step 4: where do you place the fixed point?

With a symmetrical travel the fixed point sits in the middle; the chain then only spans half the travel. If the fixed point can only be at the end, calculate with the full travel: Lk = S + π × R + allowance. That nearly doubles the chain length, so moving the fixed point pays off.

Step 5: how do you round to links?

Divide the calculated length by the pitch and round up. There is no half link; too short means the bend does not fully roll out. We supply chains in the link count matching your length, with end connectors already fitted.

TableAllowance π × R per radius
Bend radius Rπ × RBend build heightExtra with central fixed point
75 mm236 mm≈ 2 × 75 + Hi1–2 schakels
100 mm314 mm≈ 2 × 100 + Hi1–2 schakels
150 mm471 mm≈ 2 × 150 + Hi2 schakels
200 mm628 mm≈ 2 × 200 + Hi2 schakels

Frequently asked questions

Should cable length be calculated differently from chain length?
Yes. Take the chain length plus the connection lengths at both ends, plus 3 to 5% reserve for strain relief and terminating in the cabinet. Cables in the chain must never be installed under tension.
Does the formula change for a vertical arrangement?
The length formula stays the same, but the permissible free-hanging length is smaller and cables must be relieved axially with a clamp in each link group. Always ask for a check of such an arrangement.
Can I have the calculation checked?
Yes. Send travel, fill, speed and environment through the quote form; you receive a sizing proposal with chain length, link count, accessories and lead time.