Control — Tsubaki Kabelschlepp
Control by Tsubaki Kabelschlepp: the complete flexible cables series, available from stock.
All 60 articles of the Control are listed below with full technical data. This flexible cables series can be ordered online; Not sure about the right size or bend radius? Our engineers are happy to calculate your application.
60 articles in this seriesAll flexible cables
- Ordered before 15:00, shipped the same day
- Datasheet and STEP file with every article
- Technical advice from a design engineer
60 articles
45393Flexible cable - Tsubaki Kabelschlepp - Control - 4G0,5mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 4
- Cross-section 0.5 mm²
- Unscreened
Delivery in 2-3 weeks
€ 2,15per meter · excl. btw
+ € 0,22 per meter copper surcharge
45400Flexible cable - Tsubaki Kabelschlepp - Control - 12G0,5mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 12
- Cross-section 0.5 mm²
- Unscreened
Delivery in 2-3 weeks
€ 4,66per meter · excl. btw
+ € 0,67 per meter copper surcharge
45421Flexible cable - Tsubaki Kabelschlepp - Control - 3G0,75mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 3
- Cross-section 0.75 mm²
- Unscreened
Delivery in 2-3 weeks
€ 1,46per meter · excl. btw
+ € 0,26 per meter copper surcharge
45422Flexible cable - Tsubaki Kabelschlepp - Control - 4G0,75mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 4
- Cross-section 0.75 mm²
- Unscreened
Delivery in 2-3 weeks
€ 3,72per meter · excl. btw
+ € 0,35 per meter copper surcharge
45423Flexible cable - Tsubaki Kabelschlepp - Control - 5G0,75mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 5
- Cross-section 0.75 mm²
- Unscreened
Delivery in 2-3 weeks
€ 3,05per meter · excl. btw
+ € 0,43 per meter copper surcharge
45425Flexible cable - Tsubaki Kabelschlepp - Control - 7G0,75mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 7
- Cross-section 0.75 mm²
- Unscreened
Delivery in 2-3 weeks
€ 2,70per meter · excl. btw
+ € 0,59 per meter copper surcharge
45429Flexible cable - Tsubaki Kabelschlepp - Control - 12G0,75mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 12
- Cross-section 0.75 mm²
- Unscreened
Delivery in 2-3 weeks
€ 5,66per meter · excl. btw
+ € 1,08 per meter copper surcharge
45431Flexible cable - Tsubaki Kabelschlepp - Control - 18G0,75mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 18
- Cross-section 0.75 mm²
- Unscreened
Delivery in 2-3 weeks
€ 9,01per meter · excl. btw
+ € 1,64 per meter copper surcharge
45434Flexible cable - Tsubaki Kabelschlepp - Control - 25G0,75mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 25
- Cross-section 0.75 mm²
- Unscreened
Delivery in 2-3 weeks
€ 11,99per meter · excl. btw
+ € 2,34 per meter copper surcharge
45441Flexible cable - Tsubaki Kabelschlepp - Control - 3G1mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 3
- Cross-section 1 mm²
- Unscreened
Delivery in 2-3 weeks
€ 2,80per meter · excl. btw
+ € 0,33 per meter copper surcharge
45442Flexible cable - Tsubaki Kabelschlepp - Control - 4G1mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 4
- Cross-section 1 mm²
- Unscreened
Delivery in 2-3 weeks
€ 2,86per meter · excl. btw
+ € 0,49 per meter copper surcharge
45443Flexible cable - Tsubaki Kabelschlepp - Control - 5G1mm²
Tsubaki Kabelschlepp · Series Control
- Number of cores 5
- Cross-section 1 mm²
- Unscreened
Delivery in 2-3 weeks
€ 2,70per meter · excl. btw
+ € 0,54 per meter copper surcharge
Frequently asked questions
The questions our technical desk receives most often about this category.
How do I choose the right size of flexible cables?
Start with the fill: the thickest cable sets the minimum inner height, the sum of all diameters plus 10% clearance sets the inner width. Then pick a bend radius of at least ten times the thickest cable diameter. Filter on those three values on the left and only suitable articles remain.
What is the lead time and when do you ship?
Articles marked 'in stock' ship the same working day when ordered before 15:00 CET. Articles 'on request' are made to order at the manufacturer; the lead time is stated in the quotation, typically 5 to 15 working days.
Do I get technical documentation and CAD files?
Yes. Every article lists a datasheet, a manual and a STEP file for your 3D model. All are free to download, no account required.
Are the prices volume prices?
The price shown is per unit. From the indicated tier quantity onwards the lower price applies automatically and is calculated in the cart. Use the toggle at the top to show prices including or excluding VAT.
